Lane Closures

Special Messages

LC # Road Segment Work
1 Lane Closures

To provide you with the most accurate information about upcoming traffic impacts, we will give 48 hours’ notice for all lane closures (including full highway closures) and traffic switches that will be in place less than 24 hours. We will give 14 days’ notice for all lane closures and traffic switches that will be in place for more than 24 hours. For a list of lane closures across North Texas and the state, visit TxDOT’s website DriveTexas.org.

Mainlane Closures

LC # Road Segment Status Dates/Times Work
2 Northbound SH 26 from Grapevine Mills Trail to FM 2499 Current 8 PM to 6 AM each night on 8/3-8/4

Full closure of northbound SH 26 from Grapevine Mills Trail to FM 2499 for structures and roadway work and a traffic switch. Traffic will be detoured to Bass Pro Dr., then the northbound SH 121 frontage road to Sandy Lake Rd. Click here for a detour map.

3 Northbound SH 121 north of DFW Airport Upcoming 8 PM to 6 AM each night on 8/4-8/13 and 8/16-8/20

UPCOMING: Full closure of northbound SH 121 north of DFW Airport for grading and structures work. Traffic will be detoured to the northbound SH 121 frontage road. Associated closure:

  • Northbound SH 121 off-ramp to FM 2499, detour to Bass Pro Dr.
4 Northbound FM 2499 at I-635/SH 121 Upcoming 8 PM to 6 AM on 8/4

UPCOMING: Full closure on northbound FM 2499 at I-635/SH 121 for grading work. Traffic will be detoured to Freeport Pkwy. Click here for a detour map. Associated closures:

  • Northbound SH 121 off-ramp to FM 2499, detour to Freeport Pkwy.
  • Westbound I-635 off-ramp to northbound SH 121/FM 2499, detour to Bass Pro Dr.
5 Southbound SH 121 at Bass Pro Dr. Upcoming 8 PM to 6 AM each night on 8/4-8/13 and 8/16-8/20

UPCOMING: Full closure on southbound SH 121 at Bass Pro Dr. for roadway, structures, and grading work. Traffic will be detoured to the southbound SH 121 frontage road. Associated closure:

  • Southbound FM 2499 off-ramp to southbound SH 121, detour to eastbound I-635 then Royal Ln.
6 Northbound SH 121 at Bass Pro Dr. Upcoming 8 PM to 6 AM each night on 8/5-8/6 and 8/12-8/13

UPCOMING: Two left lanes closed on northbound SH 121 at Bass Pro Dr. for paving work. One lane will remain open.

7 Northbound International Pkwy. north of DFW Airport Upcoming 8 PM to 6 AM each night on 8/14-8/17

UPCOMING: Single left lane closed on northbound International Pkwy. north of DFW Airport for paving work. Multiple lanes remain open.

Frontage Road & Collector Distributor Closures

LC # Road Segment Status Dates/Times Work
8 Southbound FM 2499 frontage road at SH 26 Current 8 PM to 6 AM on 8/3

Full closure on southbound FM 2499 to SH 26 for structures work. Traffic will be detoured at Stars and Stripes to SH 26.

9 Southbound SH 121 frontage road south of Bass Pro Dr. Upcoming 8 PM to 6 AM on 8/4

UPCOMING: Single left lane closed on southbound SH 121 frontage road south of Bass Pro Dr. for grading and paving work. Right lane remains open. 

10 Southbound SH 121 frontage road north of Bass Pro Dr. Upcoming 8 PM to 6 AM on 8/4

UPCOMING: Left lane closed on southbound SH 121 frontage road north of Bass Pro Dr. for paving work. Right lane remains open. 

11 Southbound SH 121 frontage road at Bass Pro Dr. Upcoming 8 PM to 6 AM on 8/4

UPCOMING: Full closure on southbound SH 121 frontage road at Bass Pro Dr. for paving work. Traffic will be detoured to Bass Pro Dr., then Sandy Lake Rd.

12 Southbound SH 121 frontage road from Grapevine Mills Blvd. to FM 2499 Upcoming 8 PM to 6 AM on 8/4

UPCOMING: Full closure on southbound SH 121 frontage road from Grapevine Mills Blvd. to FM 2499 for structures work and a traffic switch. Traffic will be detoured to Grapevine Mills Blvd. Click here for a detour map. Associated closures:

  • Southbound SH 121 off-ramp to Grapevine Mills Pkwy., detour to Sandy Lake Rd.
  • Eastbound Stars & Stripes Way at FM 2499, detour to Grapevine Mills Blvd.

City Street Closures

LC # Road Segment Status Dates/Times Work
13 Westbound Bass Pro Dr. at SH 26 Current 8 PM to 6 AM on 8/3

Single right lane closed on westbound Bass Pro Dr. at SH 26 for paving work. Left lane will remain open.

14 Westbound Bass Pro Dr. at the SH 121 frontage road. Upcoming 8 PM to 6 AM each night on 8/4 and 8/7

UPCOMING: Single right lane closed on westbound Bass Pro Dr. at the SH 121 frontage road for paving work. Left lane will remain open.

15 Bass Pro Dr. from SH 26 to Enchanted Way Upcoming 8 PM to 6 AM on 8/4

UPCOMING: Full closure on Bass Pro Dr. from SH 26 to Enchanted Way for structures work. Click here for a detour map. Associated closures:

  • Northbound SH 121/westbound I-635 off-ramps to Bass Pro Dr., detour to Freeport Pkwy.
  • Southbound SH 121 off-ramp to Bass Pro Dr., detour to SH 26.
  • Southbound SH 121 frontage road at Bass Pro Dr., detour to SH 26.

Ramp Closures

LC # Road Segment Status Dates/Times Work
16 Westbound SH 114 off-ramp to northbound SH 121 Current 8 PM to 6 AM on 8/3

Full closure on westbound SH 114 to northbound SH 121 for grading and paving work. Traffic will be detoured to Main St., then northbound SH 121. Associated closure:

  • Single right lane closed on northbound SH 121 to Bass Pro exit. Multiple left lanes remain open.
17 Northbound SH 121 off-ramp to Bass Pro Dr. Current 8 PM to 6 AM on 8/3

Full ramp closure on northbound SH 121 off-ramp to Bass Pro Dr. for structures work. Traffic will be detoured to Freeport Pkwy.

SH 114/121 Maintenance

LC # Road Segment Status Dates/Times Work