Lane Closures

Special Messages

LC # Road Segment Work
1 Lane Closures

To provide you with the most accurate information about upcoming traffic impacts, we will give 48 hours’ notice for all lane closures (including full highway closures) and traffic switches that will be in place less than 24 hours. We will give 14 days’ notice for all lane closures and traffic switches that will be in place for more than 24 hours. For a list of lane closures across North Texas and the state, visit TxDOT’s website DriveTexas.org.

Mainlane Closures

LC # Road Segment Status Dates/Times Work
2 Northbound SH 121 at Bass Pro Dr. Current 8 PM on 10/23 to 6 AM on 10/26

Two left lanes closed on northbound SH 121 at Bass Pro Dr. for roadway and paving work. One lane will remain open.

3 Southbound SH 121 at Sandy Lake Rd. Current 8 PM on 10/23 to 6 AM on 10/26

Full closure on southbound SH 121 at Sandy Lake Rd. for utility work and a traffic switch. Traffic will be detoured to the southbound SH 121 frontage road, SH 26, then Bass Pro Dr. Click here for a detour map. 

4 Southbound FM 2499 from Grapevine Mills Blvd. to SH 121 Current 8 PM on 10/23 to 9 AM on 10/25

Full closure on southbound FM 2499 from Grapevine Mills Blvd. to SH 121 for paving work and a traffic switch. Click here for a detour map to the southbound FM 2499 frontage road. Associated closure:

5 Eastbound I-635 Upcoming 8 PM to 6 AM on 10/26 and 8 PM on 10/30 to 6 AM on 11/2

UPCOMING: Full closure on eastbound I-635 for roadway work and a traffic switch. Associated closures:

  • Full ramp closure on northbound SH 121 off-ramp to eastbound I-635, detour to Bass Pro Dr., westbound Bethel Rd., then Royal Ln.
  • Full ramp closure on southbound SH 121 off-ramp to eastbound I-635, detour to Bass Pro Dr., westbound Bethel Rd., then Royal Ln.
6 Westbound I-635 at Royal Ln. Upcoming 8 PM to 6 AM on 10/26

UPCOMING: Two left lanes closed on westbound I-635 at Royal Ln. for paving work. One lane will remain open.

7 Northbound SH 121 north of DFW Airport Upcoming 8 PM to 6 AM each on 10/27, 10/30, 11/3 and 11/5

UPCOMING: Two left lanes closed on northbound SH 121 north of DFW Airport for paving work. Right lanes remain open.

8 Westbound I-635 at Royal Ln. Upcoming 8 PM to 6 AM each night on 10/28-10/29

UPCOMING: Full closure on westbound I-635 at Royal Ln. for utility and paving work and a traffic switch. Traffic will be detoured to Royal Ln., then westbound Bethel Rd.

9 Southbound SH 121 at Bass Pro Dr. Upcoming 8 PM to 6 AM each night on 10/30 and 11/4

UPCOMING: Full closure on southbound SH 121 at Bass Pro Dr. for structures and paving work. Traffic will be detoured to the southbound SH 121 frontage road. Associated closure:

  • Southbound FM 2499 off-ramp to southbound SH 121, detour to eastbound I-635 then Royal Ln.

Frontage Road & Collector Distributor Closures

LC # Road Segment Status Dates/Times Work

City Street Closures

LC # Road Segment Status Dates/Times Work
10 Eastbound Bass Pro Dr. from SH 26 to the SH 121 frontage road Current 8 PM to 6 AM on 10/23

Full closure on eastbound Bass Pro Dr. from SH 26 to SH 121 frontage road for grading work. Traffic will be detoured to the southbound SH 121 frontage road.

11 Eastbound Bass Pro Dr. at the northbound SH 121 frontage road Current 8 PM to 6 AM on 10/24

Two right lanes closed on eastbound Bass Pro Dr. at the northbound SH 121 frontage road for paving work. Left lane remains open. 

12 East and westbound Bass Pro Dr. Current 8 AM to 3 PM on 10/26

Single right lane closed on east and westbound Bass Pro Dr. for utility work. Left lane remains open. 

13 East and westbound Bethel Rd. from SH 121 to Enchanted Way Current 8 AM to 3 PM on 10/26

Single left lanes closed on east and westbound Bethel Rd. from SH 121 to Enchanted Way for structures and utility work. Right lane remains open in each direction. Associated closures:

  • Single right lane closed on northbound SH 121 frontage road at Bass Pro Dr., left lane remains open.
14 Eastbound Bass Pro Dr. from SH 26 to the southbound SH 121 frontage road Upcoming 8 PM to 6 AM each night on 11/2-11/3

UPCOMING: Two right lanes closed on eastbound Bass Pro Dr. from Sh 26 to the southbound SH 121 frontage road for roadway work. Left lane remains open. 

Ramp Closures

LC # Road Segment Status Dates/Times Work
15 Westbound I-635 off-ramp to Bass Pro Dr. Current 8 PM on 10/23 to 6 AM on 10/26

Full ramp closure on westbound I-635 off-ramp to Bass Pro Dr. for paving and grading work. Traffic will be detoured to Freeport Pkwy. Click here for a detour map.

16 Northbound SH 121 off-ramp to Bass Pro Dr. Current 8 PM on 10/23 to 6 AM on 10/26 and 8 PM to 6 AM each night on 11/2-11/3 and 11/6-11/9

Full ramp closure on northbound SH 121 off-ramp to Bass Pro Dr. for roadway and structures work. Traffic will be detoured to Freeport Pkwy.

17 Northbound SH 121 off-ramp to eastbound I-635 Upcoming 8 PM to 6 AM on 10/26

UPCOMING: Full ramp closure on northbound SH 121 off-ramp to eastbound I-635 for grading work. Traffic will be detoured to Bass Pro Dr., then Royal Ln.

18 Southbound SH 121 off-ramp to eastbound I-635 Upcoming 8 PM to 6 AM each night on 11/3 and 11/6

UPCOMING: Full ramp closure on southbound SH 121 off-ramp to eastbound I-635 for paving work. Traffic will be detoured to the on-ramp at Bass Pro Dr.